Technical evaluation of the site, access points and workforce before starting. If necessary, a pilot zone is implemented to validate coverage and suitability.
Alignment with site procedures, LMRA and applicable safety guidelines. Installation is carried out according to the required safety standards and working conditions.
Hardware and network parameters adjusted to suit the site and application. Targeted installation with a focus on control, precision and minimal disruption.
Minimal disruption and controlled handover. The system
goes live and is returned to full operational status in a
safe, controlled manner.
Worker tracking and access control across long, segmented tunnel bores, with a focus on safety and zero disruption to the construction schedule.
CCTV and emergency intercom coverage for public-facing tunnel infrastructure, built to critical safety standards.
Biometric access control for confined utility corridors, with no impact on existing services or equipment.
Real-time headcount tracking across evolving excavation fronts, suitable for fast-changing underground environments.
Security systems for underground dam and tunnel works, installed without dismantling existing infrastructure.
Access control for vertical shaft entry points, without disruption to sensitive equipment or precision works.
Widely usable across tunnel and underground construction projects, for sites where manual tracking methods fall short.